I've been sufficiently shamed by enough of you that I had better post. It's been quite a month. We have passed all inspections. Insulation held us up a bit, but we are now proceeding at a pace. We have a targeted first floor move in date of July 30 & 31. Here are some photos of what has transpired over the past thirty days.
| Drywall being delivered to second floor. |
| Plumbing, gas line, dryer vent, septic and central heat and air in basement. |
| All those utilities need to exterior vent. Teri Soares is developing a landscape plan to mask. |
| Wood burning insert installed. A few bricks shy a a full load but that's nothing new. |
| Who knew what decay lurked beneath the front porch...perhaps this is why it significantly listed to Davisville Road. Notice the circular posts....those are used to build docks. |
| Yeah baby...walls up! Office with raised ceiling. |
| Upstairs landing. |
| View from upstairs landing with removal of wall. |
| As you can see...we really needed to re-frame front porch. |
| We are delighted with the result! |
| Interior trim work for back screened porch off master bedroom taking shape. |
| Custom re-creation of exterior detail work on guest bath window. |
| Inspiration for choosing interior paint colors. |
| Wood flooring being installed. |
| Kitchen cabinets being installled. |
| Master bath cabinets...lurking in closet. |
| Appliances awaiting installation Summer 2011 Above the Salt, Cape Cod |